LATEST NEWS
RECENT POSTS
Teignmouth Community School
BIBSE are please to announce the successful completion of a new heating system for the main School Building. Works were carried out during the summer

Derriford High Temperature Hot Water Pressurisation Plant Replacement
Photo indicates the recent installation of the HTHW pressurisation plant in the hospital’s main plant room.

BIBSE have recently completed a new clean room facility at Becton Dickinson in Plymouth.
BIBSE were responsible for the design and installation of a new constant volume mechanical ventilation system complete with terminal HEPA filtration.

Refurbishment of the Church of Assumption, Torquay
BIBSE have recently completed the refurbishment of the Church of Assumption, Torquay. The project team included Nevada Construction and EX2.

Springfield Hospital, Chelmsford
Works are almost complete at Springfield Hospital, Chelmsford. BIBSE were responsible for the mechanical design and installation of two new operating theatres, 2nd Stage recovery

Exeter City FC – St. James Park
We have commenced works at St James Park for the new Big Bank Stand Changing Rooms and Toilets. Take a look at the Exeter City

Trago Mills Build Centre
BI have recently completed the MEP installation for a new 22,475 square foot Trago Mills ‘Build Centre’ at Newton Abbot. The Main Contractor was Kier

ESAM – Carluddon Technology Park
We are pleased to announce we have secured the M&E works for the exciting £6,337,825 ESAM, Carluddon Technology Park project in St Austell. The ESAM